{"id":755,"date":"2025-07-28T09:47:19","date_gmt":"2025-07-28T09:47:19","guid":{"rendered":"https:\/\/startersites.io\/blocksy\/web-studio\/?post_type=project&#038;p=755"},"modified":"2026-08-11T15:33:29","modified_gmt":"2026-08-11T15:33:29","slug":"caso-practico-sobre-el-conector-pv4","status":"publish","type":"project","link":"https:\/\/www.pvlinktech.com\/es\/project\/pv4-connector-case-study\/","title":{"rendered":"Caso pr\u00e1ctico sobre el conector PV4"},"content":{"rendered":"<div class=\"wp-block-greenshift-blocks-row alignfull gspb_row gspb_row-id-gsbp-e0499b7\" id=\"gspb_row-id-gsbp-e0499b7\">\n<div class=\"wp-block-greenshift-blocks-row-column gspb_row__col--12 gspb_col-id-gsbp-1deb2f2\" id=\"gspb_col-id-gsbp-1deb2f2\">\n<article class=\"pvlt-case\" aria-labelledby=\"pvlt-case-title\">\n\n<header class=\"pvlt-case__header\">\n\n<h1 id=\"pvlt-case-title\">PV4 Connector Case Study: 120MW Solar Project in Indonesia<\/h1>\n\n<p class=\"pvlt-case__intro\">This PV4 connector case study explains how PVLinkTech supplied IP68 PV4 connectors and Y-branch cable assemblies for a 120MW floating and ground-mount solar project in Indonesia. The connector configuration was selected for a 1,500V DC system operating in a humid tropical environment.<\/p>\n\n<\/header>\n\n<aside class=\"pvlt-case__facts\">\n\n<h2>Project at a Glance<\/h2>\n\n<dl>\n\n<div><dt>Project type<\/dt><dd>Floating and ground-mount solar PV<\/dd><\/div>\n\n<div><dt>Installed capacity<\/dt><dd>120MW<\/dd><\/div>\n\n<div><dt>Location<\/dt><dd>Indonesia<\/dd><\/div>\n\n<div><dt>Customer type<\/dt><dd>Tier-1 EPC contractor<\/dd><\/div>\n\n<div><dt>Connection solution<\/dt><dd>IP68 PV4 connectors and Y-branch cable assemblies<\/dd><\/div>\n\n<div><dt>System design<\/dt><dd>1.500 V CC<\/dd><\/div>\n\n<div><dt>Applicable compliance<\/dt><dd>T\u00dcV \/ IEC 62852<\/dd><\/div>\n\n<\/dl>\n\n<\/aside>\n\n<figure class=\"pvlt-case__figure pvlt-case__figure--wide\">\n\n<img loading=\"lazy\" src=\"https:\/\/www.pvlinktech.com\/wp-content\/uploads\/2026\/08\/exec-95c3f2e4-f448-4513-8b54-8b32bc8a2e08.webp\" alt=\"PV4 connector case study for a 120MW floating solar project in Indonesia\" width=\"1254\" height=\"706\" decoding=\"async\">\n\n<figcaption>Floating solar PV arrays at the 120MW project site in Indonesia.<\/figcaption>\n\n<\/figure>\n\n<div class=\"pvlt-case__body\">\n\n<nav class=\"pvlt-case__toc\">\n\n<strong>In this case study<\/strong>\n\n<a href=\"#background\">Project Background<\/a><a href=\"#challenge\">The Challenge<\/a><a href=\"#solution\">PV4 Connector Solution<\/a><a href=\"#verification\">Verification and Delivery<\/a><a href=\"#outcome\">Project Outcome<\/a><a href=\"#faq\">Project FAQ<\/a>\n\n<\/nav>\n\n<section id=\"background\">\n\n<h2>Project Background<\/h2>\n\n<p>The project involved a 120MW solar PV installation in Indonesia, combining floating and ground-mount applications. The EPC contractor required a DC connection solution for outdoor cable routing across a site exposed to humidity, seasonal rainfall, ultraviolet radiation and changing temperatures.<\/p>\n\n<p>For a utility-scale solar project, connector selection is not limited to choosing a product with a stated protection rating. The connector has to match the cable specification, system voltage, branch layout and installation method.<\/p>\n\n<p>PVLinkTech reviewed the project requirements before supply and prepared a PV4 connector and Y-branch cable assembly configuration for the confirmed 1,500V DC solar system.<\/p>\n\n<\/section>\n\n<section id=\"challenge\">\n\n<h2>The Challenge<\/h2>\n\n<p>Indonesia\u2019s humid, tropical climate placed particular emphasis on outdoor connection protection. The project team needed connectors that could be used in the confirmed cable configuration while supporting the project\u2019s requirements for water resistance and long-term outdoor use.<\/p>\n\n<ul><li>Outdoor exposure to humidity, rainfall, dust and UV radiation<\/li><li>A 1,500V DC solar PV system design<\/li><li>PV4 connector compatibility for the confirmed project configuration<\/li><li>Y-branch cable assemblies for applicable solar cable routing<\/li><\/ul>\n\n<\/section>\n\n<section id=\"solution\">\n\n<h2>PV4 Connector Case Study: The Connector Solution<\/h2>\n\n<p>PVLinkTech supplied IP68 PV4 connectors and Y-branch cable assemblies for the project. The solution was selected around the confirmed application requirements rather than as a general-purpose connector package.<\/p>\n\n<div class=\"pvlt-case__table\"><table><tbody>\n\n<tr><th>Solicitud<\/th><td>Utility-scale floating and ground-mount solar PV<\/td><\/tr>\n\n<tr><th>Project capacity<\/th><td>120MW<\/td><\/tr>\n\n<tr><th>Location<\/th><td>Indonesia<\/td><\/tr>\n\n<tr><th>Connector type<\/th><td>PV4 connector configuration<\/td><\/tr>\n\n<tr><th>\u00cdndice de protecci\u00f3n<\/th><td>IP68<\/td><\/tr>\n\n<tr><th>System voltage<\/th><td>1.500 V CC<\/td><\/tr>\n\n<tr><th>Cable assembly<\/th><td>Y-branch cable assemblies for applicable connections<\/td><\/tr>\n\n<tr><th>Compliance<\/th><td>T\u00dcV \/ IEC 62852 for the applicable product configuration<\/td><\/tr>\n\n<\/tbody><\/table><\/div>\n\n<figure class=\"pvlt-case__figure\">\n\n<img src=\"https:\/\/www.pvlinktech.com\/wp-content\/uploads\/2026\/08\/exec-d8c41fbe-6296-4560-92c7-d836a72f2983.webp\" alt=\"Illustrative close-up of PV4 connectors and Y-branch cable assemblies in an outdoor solar installation\" width=\"1448\" height=\"1086\" loading=\"lazy\" decoding=\"async\">\n\n<figcaption>Illustrative image of a PV4 connector and Y-branch cable assembly configuration.<\/figcaption>\n\n<\/figure>\n\n<\/section>\n\n<section id=\"verification\">\n\n<h2>Verification and Delivery<\/h2>\n\n<p>Before production and shipment, the connector and cable assembly configuration was checked against the confirmed project requirements. Depending on the final product model and order requirements, applicable verification can include visual inspection, assembly checks, cable retention checks, continuity testing, labeling confirmation and packing inspection.<\/p>\n\n<figure class=\"pvlt-case__figure\">\n\n<img src=\"https:\/\/www.pvlinktech.com\/wp-content\/uploads\/2026\/08\/exec-98c6b0ca-abf0-4f3a-9fad-2f0b27bd6bee.webp\" alt=\"Illustrative quality inspection of solar PV connectors before shipment\" width=\"1448\" height=\"1086\" loading=\"lazy\" decoding=\"async\">\n\n<figcaption>Illustrative image of connector quality inspection. Actual inspection scope depends on the confirmed order requirements.<\/figcaption>\n\n<\/figure>\n\n<figure class=\"pvlt-case__figure\">\n\n<img src=\"https:\/\/www.pvlinktech.com\/wp-content\/uploads\/2026\/08\/exec-2cbb7ac2-8758-40d0-8201-fa3632477a84.webp\" alt=\"Illustrative export packing of PV4 connectors and Y-branch cable assemblies\" width=\"1448\" height=\"1086\" loading=\"lazy\" decoding=\"async\">\n\n<figcaption>Illustrative image of export packing. It does not show the actual shipment for this project.<\/figcaption>\n\n<\/figure>\n\n<\/section>\n\n<section id=\"outcome\">\n\n<h2>Project Outcome<\/h2>\n\n<p>The project received a PV4 connector and Y-branch cable assembly solution selected for its confirmed 1,500V DC design and tropical outdoor installation environment.<\/p>\n\n<div class=\"pvlt-case__takeaway\"><strong>Key takeaway:<\/strong> For utility-scale solar PV, a connector must be selected as part of the complete cable and installation configuration\u2014not only by its appearance or stated IP rating.<\/div>\n\n<\/section>\n\n<section id=\"faq\" class=\"pvlt-case__faq\">\n\n<h2>Project FAQ<\/h2>\n\n<details><summary>What connector protection rating was used for this project?<\/summary><p>The project used an IP68 PV4 connector configuration for the confirmed outdoor solar PV application.<\/p><\/details>\n\n<details><summary>What system voltage was involved?<\/summary><p>The connector configuration was selected for a 1,500V DC solar PV system.<\/p><\/details>\n\n<details><summary>What products did PVLinkTech supply?<\/summary><p>PVLinkTech supplied PV4 connectors and Y-branch cable assemblies for applicable solar cable connection points.<\/p><\/details>\n\n<\/section>\n\n<section class=\"pvlt-case__related\">\n\n<h2>Related PVLinkTech Solutions<\/h2>\n\n<ul>\n\n<li><a href=\"https:\/\/www.pvlinktech.com\/es\/conectores-solares-mc4-y-pv4\/\">Conectores solares MC4 y PV4<\/a><\/li>\n\n<li><a href=\"https:\/\/www.pvlinktech.com\/es\/control-de-calidad\/\">PVLinkTech Quality Control<\/a><\/li>\n\n<\/ul>\n\n<\/section>\n\n<\/div>\n\n<\/article>\n\n<style>\n\n.pvlt-case{--blue:#0057B8;--green:#5ACB2E;--navy:#07365f;--text:#3e5063;--line:#d9e4ee;--soft:#f1f6fb;max-width:930px;margin:auto;color:var(--text);font:17px\/1.75 Arial,sans-serif}.pvlt-case *{box-sizing:border-box}.pvlt-case h1,.pvlt-case h2{color:var(--navy);line-height:1.2}.pvlt-case h1{margin:0 0 20px;font-size:clamp(36px,5vw,56px)}.pvlt-case h2{margin:0 0 18px;font-size:clamp(27px,3vw,35px)}.pvlt-case p{margin:0 0 20px}.pvlt-case__header{padding:54px 0 30px;border-bottom:1px solid var(--line)}.pvlt-case__label{color:var(--blue);font-size:12px;font-weight:800;letter-spacing:.13em}.pvlt-case__intro{max-width:820px;font-size:clamp(18px,2.2vw,22px);line-height:1.55}.pvlt-case__facts{margin:32px 0 40px;padding:24px 26px;border-left:5px solid var(--blue);border-radius:0 12px 12px 0;background:var(--soft)}.pvlt-case__facts h2{font-size:21px}.pvlt-case__facts dl{display:grid;grid-template-columns:repeat(2,1fr);gap:12px 28px;margin:0}.pvlt-case__facts div{display:grid;grid-template-columns:130px 1fr;gap:8px}.pvlt-case__facts dt{color:#678098;font-size:13px}.pvlt-case__facts dd{margin:0;color:var(--navy);font-size:14px;font-weight:700}.pvlt-case__body{max-width:760px;margin:auto}.pvlt-case__body section{margin:0 0 55px}.pvlt-case__figure{margin:28px 0 36px}.pvlt-case__figure img{display:block;width:100%;height:auto;border:1px solid var(--line);border-radius:12px}.pvlt-case__figure figcaption{margin-top:8px;color:#718297;font-size:13px}.pvlt-case__toc{display:flex;flex-wrap:wrap;gap:7px 16px;margin:0 0 42px;padding:17px 0;border-block:1px solid var(--line);font-size:14px}.pvlt-case a{color:var(--blue);font-weight:700;text-decoration:none}.pvlt-case__table{overflow-x:auto;border:1px solid var(--line);border-radius:10px}.pvlt-case table{width:100%;min-width:530px;border-collapse:collapse;font-size:14px}.pvlt-case th,.pvlt-case td{padding:13px 16px;border-bottom:1px solid var(--line);text-align:left}.pvlt-case th{width:34%;color:var(--navy);background:#f8fbfe}.pvlt-case__takeaway{padding:18px 20px;border-left:4px solid var(--green);background:#f1faed}.pvlt-case__faq details{margin-bottom:10px;border:1px solid var(--line);border-radius:8px}.pvlt-case__faq summary{padding:16px 18px;color:var(--navy);font-weight:800}.pvlt-case__faq p{padding:0 18px 16px}.pvlt-case__related{padding:27px;border-radius:12px;background:var(--soft)}@media(max-width:700px){.pvlt-case{width:calc(100% - 32px)}.pvlt-case__facts dl{grid-template-columns:1fr}.pvlt-case__facts div{grid-template-columns:1fr;gap:2px}}\n\n<\/style>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":4738,"parent":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_gspb_post_css":"#gspb_row-id-gsbp-e0499b7{justify-content:space-between;margin-top:0;margin-bottom:0;display:flex;flex-wrap:wrap}#gspb_row-id-gsbp-e0499b7>.gspb_row__content{display:flex;justify-content:space-between;margin:0 auto;width:100%;flex-wrap:wrap}.gspb_row{position:relative}div[id^=gspb_col-id]{box-sizing:border-box;position:relative}#gspb_col-id-gsbp-1deb2f2.gspb_row__col--12{width:100%}@media (max-width:575.98px){#gspb_col-id-gsbp-1deb2f2.gspb_row__col--12{width:100%}}","footnotes":""},"project_category":[70],"class_list":["post-755","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-connector-application"],"blocksy_meta":{"has_hero_section":"disabled","styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"acf":[],"_links":{"self":[{"href":"https:\/\/www.pvlinktech.com\/es\/wp-json\/wp\/v2\/project\/755","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pvlinktech.com\/es\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.pvlinktech.com\/es\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.pvlinktech.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pvlinktech.com\/es\/wp-json\/wp\/v2\/comments?post=755"}],"version-history":[{"count":0,"href":"https:\/\/www.pvlinktech.com\/es\/wp-json\/wp\/v2\/project\/755\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pvlinktech.com\/es\/wp-json\/wp\/v2\/media\/4738"}],"wp:attachment":[{"href":"https:\/\/www.pvlinktech.com\/es\/wp-json\/wp\/v2\/media?parent=755"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.pvlinktech.com\/es\/wp-json\/wp\/v2\/project_category?post=755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}